This page explains the assessed blasting-and-painting route for structural steel requiring an intumescent coating system. Preparation, primer, intumescent mid-coat and protective topcoat need to align with the actual project specification, steel section factor and required fire-resistance period.
The steel's condition, the proposed coating system, access, inspection needs and handover sequence all matter. Where abrasive preparation is required, the project specification should determine the agreed cleanliness and profile before the compatible coating system is selected and applied.
The approved HB Tunnelling case study records abrasive blasting, immediate primer and intumescent fire-protective painting at a Doncaster warehouse refurbishment. Its location and project facts are specific to that documented record; read the Doncaster case study for the full approved context.